Computed decision comparison

Mini-split vs central air cost

The modeled upfront totals are $9,840 for Mini-split and $11,183 for Central air scope proxy, a difference of $1,343.

The mini-split record defaults to two zones. The central-air side uses the one-system general HVAC replacement record, so capacity and duct scope must be reconciled in a proposal.

Side-by-side upfront cost

Current national model comparison
MeasureMini-splitCentral air scope proxy
Materials$5,553$6,620
Labor$3,887$3,887
Permits$250$425
Disposal$150$250
Planning range$7,380–$13,284$8,387–$15,097
Typical upfront total$9,840$11,183

Mini-split derivation: Two-zone mini-split default. Central air scope proxy derivation: One-system HVAC replacement default.

Upfront, 10-year, and 20-year totals

HorizonMini-splitCentral air scope proxy
Upfront$9,840$11,183
10 yearsNot modeled: no sourced lifespanNot modeled: no sourced lifespan
20 yearsNot modeled: no sourced lifespanNot modeled: no sourced lifespan

When each model aligns with the decision

Decision priorityModel comparisonAligned option
Lower modeled upfront totalDifference $1,343Mini-split
Lower labor share39.5% vs 34.8%Central air scope proxy
Narrower published range1.80× vs 1.80×Mini-split

This table compares model properties; it does not recommend a material, system, repair, or replacement.

Open the underlying calculators

Comparison questions

Which option has the lower modeled upfront cost?

Mini-split is lower in the current static default by $1,343. This compares model records, not contractor proposals.

Are 10-year and 20-year replacement costs included?

No sourced lifespan field exists in the shared baseline store, so the site does not invent replacement cycles. Those horizon cells remain explicitly not modeled.

Do both options use the same source system?

Yes. Both are computed from the current baseline store and index snapshots. Any proxy, quantity normalization, or retained legacy factor is disclosed beside the option.