HVAC static cost scenario

Furnace Replacement Cost in Denver, CO

The modeled typical cost is $7,312, with a planning range of $5,484 to $9,872 for Denver, CO.

Denver, CO labor multiplier 1.06×Cost model uses the published 2026-07 index period.

Computed cost breakdown

Static calculation for Denver, CO
Line itemArithmetic basisAmount
Materials1 system × indexed material rate$4,164
Labor1 system × indexed labor rate × 1.06$2,668
PermitsBaseline allowance$300
Disposal1 system × disposal rate$180
Typical total$7,312

Low $5,484 · Typical $7,312 · High $9,872

Difference from the parent scenario

Denver, CO uses a 1.06× labor factor, 6.5% above the national wage factor. The resulting total is 2.3% above the parent national total because materials and fixed allowances do not change.

Open the interactive furnace replacement cost to change quality, scope, contingency, or ZIP.

Denver, CO metro calculation record

Denver, CO is Census CBSA 19740, ranked 19 among the 50 metros evaluated for this release, with a 2025 population estimate of 3,092,037. Its BLS wage factor changes the modeled labor line from $2,506 nationally to $2,668 here, a difference of $162. The complete project moves from $7,151 to $7,312 per system after materials and fixed allowances remain unchanged.

Primary cost controls

  • Equipment capacity and efficiency
  • Ductwork or electrical changes
  • Number of zones
  • Climate and design load

Furnace replacement should identify fuel, input and output capacity, efficiency, blower performance, vent category, combustion air, gas piping, condensate, electrical work, filter cabinet, controls, duct transitions, startup tests, permits, and removal. It is not a whole-system heat-pump allowance; compare rated output at design conditions and any separate cooling equipment.

Questions about this scenario

What is the modeled typical cost for Denver, CO?

The static default is $7,312, with a planning range of $5,484 to $9,872 from the shared calculator record.

What changes from the national calculator?

Only labor uses the 1.06× metro wage factor. Materials, permits, disposal, baseline date, and index series remain tied to the parent model.

Is this a local contractor quote?

No. It is a static planning scenario generated from the public baseline store. Confirm site conditions, scope, code requirements, and price in written local proposals.