Exterior static cost scenario
Vinyl Siding Cost in Philadelphia, PA
The modeled typical cost is $15,505, with a planning range of $11,629 to $20,932 for Philadelphia, PA.
Computed cost breakdown
| Line item | Arithmetic basis | Amount |
|---|---|---|
| Materials | 1,800 sq ft × indexed material rate | $8,063 |
| Labor | 1,800 sq ft × indexed labor rate × 1.05 | $6,202 |
| Permits | Baseline allowance | $250 |
| Disposal | 1,800 sq ft × disposal rate | $990 |
| Typical total | $15,505 | |
Low $11,629 · Typical $15,505 · High $20,932
Difference from the parent scenario
Philadelphia, PA uses a 1.05× labor factor, 5.3% above the national wage factor. The resulting total is 2.0% above the parent national total because materials and fixed allowances do not change.
Open the interactive vinyl siding cost to change quality, scope, contingency, or ZIP.
Philadelphia, PA metro calculation record
Philadelphia, PA is Census CBSA 37980, ranked 9 among the 50 metros evaluated for this release, with a 2025 population estimate of 6,329,118. Its BLS wage factor changes the modeled labor line from $5,892 nationally to $6,202 here, a difference of $310. The complete project moves from $8 to $9 per sq ft after materials and fixed allowances remain unchanged.
Primary cost controls
- Project size and site access
- Material or finish tier
- Removal and disposal
- Ground, drainage, or structural conditions
This model narrows the cladding to vinyl siding. A comparable proposal should state panel profile and thickness, color class, housewrap work, insulation backing, starter and corner pieces, window and door trim, soffit and fascia, removal, disposal, and workmanship coverage. It should not be treated as a fiber-cement, engineered-wood, or metal-siding allowance.
Questions about this scenario
What is the modeled typical cost for Philadelphia, PA?
The static default is $15,505, with a planning range of $11,629 to $20,932 from the shared calculator record.
What changes from the national calculator?
Only labor uses the 1.05× metro wage factor. Materials, permits, disposal, baseline date, and index series remain tied to the parent model.
Is this a local contractor quote?
No. It is a static planning scenario generated from the public baseline store. Confirm site conditions, scope, code requirements, and price in written local proposals.