Exterior static cost scenario

Siding Cost in Minneapolis, MN

The modeled typical cost is $22,434, with a planning range of $16,825 to $30,286 for Minneapolis, MN.

Minneapolis, MN labor multiplier 1.18×Cost model uses the published 2026-07 index period.

Computed cost breakdown

Static calculation for Minneapolis, MN
Line itemArithmetic basisAmount
Materials1,800 sq ft × indexed material rate$11,406
Labor1,800 sq ft × indexed labor rate × 1.18$9,583
PermitsBaseline allowance$275
Disposal1,800 sq ft × disposal rate$1,170
Typical total$22,434

Low $16,825 · Typical $22,434 · High $30,286

Difference from the parent scenario

Minneapolis, MN uses a 1.18× labor factor, 18.3% above the national wage factor. The resulting total is 7.1% above the parent national total because materials and fixed allowances do not change.

Open the interactive siding cost to change quality, scope, contingency, or ZIP.

Minneapolis, MN metro calculation record

Minneapolis, MN is Census CBSA 33460, ranked 16 among the 50 metros evaluated for this release, with a 2025 population estimate of 3,790,295. Its BLS wage factor changes the modeled labor line from $8,102 nationally to $9,583 here, a difference of $1,481. The complete project moves from $12 to $12 per sq ft after materials and fixed allowances remain unchanged.

Primary cost controls

  • Project size and site access
  • Material or finish tier
  • Removal and disposal
  • Ground, drainage, or structural conditions

This general siding model is material-neutral. Its scope should identify removal, weather-resistive barrier repair, flashing, trim, soffit, fascia, insulation, penetrations, and the selected cladding system. Use the vinyl-specific calculator when vinyl is already selected; use this broader record when comparing systems or when the wall assembly remains undecided.

Questions about this scenario

What is the modeled typical cost for Minneapolis, MN?

The static default is $22,434, with a planning range of $16,825 to $30,286 from the shared calculator record.

What changes from the national calculator?

Only labor uses the 1.18× metro wage factor. Materials, permits, disposal, baseline date, and index series remain tied to the parent model.

Is this a local contractor quote?

No. It is a static planning scenario generated from the public baseline store. Confirm site conditions, scope, code requirements, and price in written local proposals.