Interior remodel static cost scenario
Kitchen Remodel Cost in Memphis, TN
The modeled typical cost is $32,154, with a planning range of $22,508 to $51,768 for Memphis, TN.
Computed cost breakdown
| Line item | Arithmetic basis | Amount |
|---|---|---|
| Materials | 1 project × indexed material rate | $19,993 |
| Labor | 1 project × indexed labor rate × 0.88 | $10,060 |
| Permits | Baseline allowance | $900 |
| Disposal | 1 project × disposal rate | $1,200 |
| Typical total | $32,154 | |
Low $22,508 · Typical $32,154 · High $51,768
Difference from the parent scenario
Memphis, TN uses a 0.88× labor factor, -12.2% below the national wage factor. The resulting total is 4.2% below the parent national total because materials and fixed allowances do not change.
Open the interactive kitchen remodel cost to change quality, scope, contingency, or ZIP.
Memphis, TN metro calculation record
Memphis, TN is Census CBSA 32820, ranked 45 among the 50 metros evaluated for this release, with a 2025 population estimate of 1,341,412. Its BLS wage factor changes the modeled labor line from $11,457 nationally to $10,060 here, a difference of $1,397. The complete project moves from $33,550 to $32,154 per project after materials and fixed allowances remain unchanged.
Primary cost controls
- Room or project size
- Finish and material tier
- Layout and structural changes
- Trade coordination and access
Kitchen scope depth distinguishes a surface refresh from a full layout change. A light scope keeps the existing cabinet boxes, appliance locations, plumbing points, and electrical layout. Standard scope allows coordinated cabinet, counter, flooring, lighting, and appliance work without major structural changes. Extensive scope can include moving utilities, opening walls, custom millwork, premium surfaces, and added trade coordination; contractor proposals should state those items separately.
Questions about this scenario
What is the modeled typical cost for Memphis, TN?
The static default is $32,154, with a planning range of $22,508 to $51,768 from the shared calculator record.
What changes from the national calculator?
Only labor uses the 0.88× metro wage factor. Materials, permits, disposal, baseline date, and index series remain tied to the parent model.
Is this a local contractor quote?
No. It is a static planning scenario generated from the public baseline store. Confirm site conditions, scope, code requirements, and price in written local proposals.