HVAC static cost scenario
HVAC Load & Cost in Denver, CO
The modeled typical cost is $11,852, with a planning range of $8,889 to $16,000 for Denver, CO.
Computed cost breakdown
| Line item | Arithmetic basis | Amount |
|---|---|---|
| Materials | 1,800 sq ft × indexed material rate | $6,919 |
| Labor | 1,800 sq ft × indexed labor rate × 1.06 | $4,312 |
| Permits | Baseline allowance | $350 |
| Disposal | 1,800 sq ft × disposal rate | $270 |
| Typical total | $11,852 | |
Low $8,889 · Typical $11,852 · High $16,000
Difference from the parent scenario
Denver, CO uses a 1.06× labor factor, 6.5% above the national wage factor. The resulting total is 2.3% above the parent national total because materials and fixed allowances do not change.
Open the interactive hvac load & cost to change quality, scope, contingency, or ZIP.
Denver, CO metro calculation record
Denver, CO is Census CBSA 19740, ranked 19 among the 50 metros evaluated for this release, with a 2025 population estimate of 3,092,037. Its BLS wage factor changes the modeled labor line from $4,051 nationally to $4,312 here, a difference of $261. The complete project moves from $6,439 to $6,584 per 1,000 sq ft after materials and fixed allowances remain unchanged.
Primary cost controls
- Equipment capacity and efficiency
- Ductwork or electrical changes
- Number of zones
- Climate and design load
This worksheet treats conditioned floor area as the starting point for a whole-home heating and cooling load scenario. Its boundary is broader than furnace selection: envelope leakage, glazing, orientation, occupants, ventilation, ducts, and design weather still require a Manual J calculation. The attached cost is a planning layer for replacement scope, not an equipment schedule or permit-ready design.
Questions about this scenario
What is the modeled typical cost for Denver, CO?
The static default is $11,852, with a planning range of $8,889 to $16,000 from the shared calculator record.
What changes from the national calculator?
Only labor uses the 1.06× metro wage factor. Materials, permits, disposal, baseline date, and index series remain tied to the parent model.
Is this a local contractor quote?
No. It is a static planning scenario generated from the public baseline store. Confirm site conditions, scope, code requirements, and price in written local proposals.