Heat Pump Cost in Denver, CO

The modeled typical cost is $11,672, with a planning range of $8,754 to $15,758 for Denver, CO.

Denver, CO labor multiplier 1.06×Cost model uses the published 2026-07 index period.

Computed cost breakdown

Static calculation for Denver, CO
Line itemArithmetic basisAmount
Materials1 system × indexed material rate$7,261
Labor1 system × indexed labor rate × 1.06$3,811
PermitsBaseline allowance$350
Disposal1 system × disposal rate$250
Typical total$11,672

Low $8,754 · Typical $11,672 · High $15,758

Difference from the parent scenario

Denver, CO uses a 1.06× labor factor, 6.5% above the national wage factor. The resulting total is 2.0% above the parent national total because materials and fixed allowances do not change.

Open the interactive heat pump cost to change quality, scope, contingency, or ZIP.

Denver, CO metro calculation record

Denver, CO is Census CBSA 19740, ranked 19 among the 50 metros evaluated for this release, with a 2025 population estimate of 3,092,037. Its BLS wage factor changes the modeled labor line from $3,580 nationally to $3,811 here, a difference of $231. The complete project moves from $11,441 to $11,672 per system after materials and fixed allowances remain unchanged.

Primary cost controls

  • Equipment capacity and efficiency
  • Ductwork or electrical changes
  • Number of zones
  • Climate and design load

This model isolates a heat-pump system as the project unit. The written proposal should identify system type, capacity, efficiency ratings, indoor and outdoor equipment, refrigerant-line work, controls, electrical changes, commissioning, and any backup heat. Duct replacement and envelope improvements are outside the default record unless a contractor lists them as separate scope.

Questions about this scenario

What is the modeled typical cost for Denver, CO?

The static default is $11,672, with a planning range of $8,754 to $15,758 from the shared calculator record.

What changes from the national calculator?

Only labor uses the 1.06× metro wage factor. Materials, permits, disposal, baseline date, and index series remain tied to the parent model.

Is this a local contractor quote?

No. It is a static planning scenario generated from the public baseline store. Confirm site conditions, scope, code requirements, and price in written local proposals.