Interior remodel static cost scenario

Bathroom Remodel Cost for 150% modeled scope

The modeled typical cost is $24,652, with a planning range of $17,256 to $39,689 for 150% modeled scope.

National labor at 150% modeled scopeCost model uses the published 2026-07 index period.

Computed cost breakdown

Static calculation for 150% modeled scope
Line itemArithmetic basisAmount
Materials150% modeled scope × indexed material rate$13,438
Labor150% modeled scope × indexed labor rate × 1.00$9,513
PermitsBaseline allowance$650
Disposal150% modeled scope × disposal rate$1,050
Typical total$24,652

Low $17,256 · Typical $24,652 · High $39,689

Difference from the parent scenario

This quantity-specific total is 48.0% above the parent default of $16,651. The arithmetic changes quantity while retaining the parent model’s rates and national wage factor.

Open the interactive bathroom remodel cost to change quality, scope, contingency, or ZIP.

Primary cost controls

  • Room or project size
  • Finish and material tier
  • Layout and structural changes
  • Trade coordination and access

Bathroom scope depth changes the wet-area work. A light scope keeps the existing fixture locations and focuses on finishes and fittings. Standard scope can replace the shower or tub assembly, vanity, floor, lighting, and ventilation while retaining the room footprint. Extensive scope may move drains or supply lines, rebuild waterproof assemblies, change walls, or add accessibility work; a proposal should identify waterproofing, substrate repair, and inspection scope.

Questions about this scenario

What is the modeled typical cost for 150% modeled scope?

The static default is $24,652, with a planning range of $17,256 to $39,689 from the shared calculator record.

What changes from the national calculator?

The modeled quantity changes to 150% modeled scope. The same baseline rates, index changes, quality setting, and national labor factor are retained.

Is this a local contractor quote?

No. It is a static planning scenario generated from the public baseline store. Confirm site conditions, scope, code requirements, and price in written local proposals.