Kitchen Remodel Cost

Project inputs

Project
Location
ZIP affects labor only. Blank uses the national average.
Advanced assumptions

Estimated project cost

Typical national cost
$33,550
$23,485 – $54,016
$33,550 per project
National$33,550
ZIP adjusted$33,550
Materials$19,993 · 60%
Labor$11,457 · 34%
Permits$900 · 3%
Disposal$1,200 · 4%
Semantic cost breakdown
ComponentDollarsShare
Materials$19,99359.6%
Labor$11,45734.1%
Permits$9002.7%
Disposal$1,2003.6%

National labor multiplier: 1.000×. Enter a ZIP to match a metro or state wage factor.

Calculation record

Baseline date2026-01-01
Baseline provenancemodeled estimate, not directly sourced
Material indexPCU423300423300 · 9.25%
Labor indexCES2000000003 · 2.29%
Data statusCost model and index data updated automatically on 2026-08-15.

material = baseline material rate × quantity × index change × quality
labor = baseline labor rate × quantity × index change × ZIP wage multiplier
subtotal = material + labor + permit + disposal

Sources used for this estimate

Every baseline number and its provenance

Numeric inputs used by the default model
InputPublished valueSource or derivation
Default quantity1 projecthct-default-scenario-v1
User-editable starting quantity selected for the static worked example.
Material base rate$18,300 / projecthct-legacy-baseline-v1
Locked base-period material input. Current material = input × quantity × verified material-index ratio × selected quality factor.
Labor base rate$11,200 / projecthct-legacy-baseline-v1
Locked base-period labor input. Current labor = input × quantity × verified labor-index ratio × regional wage multiplier × selected quality factor.
Permit allowance$900hct-legacy-baseline-v1
Locked national planning allowance added once; an applicable local fee schedule supersedes it.
Disposal base rate$1,200 / projecthct-legacy-baseline-v1
Locked base-period removal and disposal allowance multiplied by project quantity.
Low range factor0.70×hct-variance-model-v1
Disclosed low planning factor applied to the calculated subtotal.
High range factor1.61×hct-variance-model-v1
Disclosed high planning factor applied to the calculated subtotal.

The public datasets above support wage selection, index movement, and plausibility validation. They do not claim to publish each exact locked legacy baseline. Compare all public baseline records.

Index escalation tracks the direction of input costs, not a local market price. Actual quotes vary with labor availability, permit requirements, site conditions, and local competition. Read the full methodology.

Powered by HomeCostTotals Kitchen Remodel Cost